Define the blend in dry-solids terms
A volume ratio between primary sludge and WAS does not describe the solids ratio unless both concentrations are known. Record stream flow and dry solids over matched intervals, along with the mixing tank and separator feed condition. Changes in either stream can alter the effective blend without an obvious change in pump settings.
State whether the mixed sludge is fresh, stored, thickened or digested before dewatering. Preserve upstream chemical and holding information. A product selected on one favorable grab sample should not be described as approved for every primary-to-secondary combination handled by the plant.
Screen representative blend boundaries
Prepare candidates on actual current blends where possible. Include the common condition and credible primary-rich and WAS-rich windows, retaining the incumbent reference. If laboratory blending is necessary, label it explicitly and use measured solids fractions rather than approximating the mixture by container volume alone.
Keep preparation, active-dose basis and mixing sequence consistent. Compare drainage and post-shear liquid solids for each blend before assigning a single preferred code. A narrow winner at the average condition can be a poor purchase if it fails during routine wasting or primary-sludge transfer.
Translate the blend into machine acceptance
Record cake, capture, throughput and handling under stable separator settings, with synchronized feed samples. On a belt press, observe gravity drainage and release; on a centrifuge, retain centrate and torque evidence. Select the measurement set appropriate to the actual equipment rather than applying one visual test to every separator.
Define whether one grade can cover the blend range using an adjusted active dose or whether separate operating modes need further evaluation. Do not switch products automatically as the blend changes unless preparation, clearance and controls have been qualified. Uncontrolled changes can make an otherwise manageable feed harder to interpret.
Write a bounded supply approval
The RFQ should identify the demonstrated blend range, current dose basis, machine window and the response expected when the blend leaves that range. Ask for coded candidates, trial material and documents tied to each proposed identity. Include the practical difficulty of obtaining representative samples when planning the trial schedule.
Retain blend calculations with the acceptance record and purchase description. Recheck after a major wasting or primary-treatment change. Routine supply should reproduce the accepted operating envelope, while an untested blend remains a requalification question rather than an implied supplier guarantee.
Prepare a focused sample and quotation request
Report the primary-to-WAS dry-solids blend range and the operating periods represented in the samples. State whether one grade must cover that range or whether a second supply identity is open for qualification, without presuming either option has already passed. Preserve the baseline from the corresponding operating qualification.
Related purchase checks: Polymer for Waste Activated Sludge Dewatering: Build a Purchase Brief; Cationic Sludge Dewatering Polymer: What to Put in a Grade Specification. Submit the defined requirement with the sludge polymer sample and quotation request.